← Back to selected work
01Systems & Infrastructure◎ Archived

OneCraft Network Ecosystem

High-concurrency multiplayer server infrastructure & backend modding

12-month production network engineered from rescued physical hardware up to an Intel i9 bare-metal cloud cluster. Featured custom Java plugin forks, multi-tier reverse proxies, automated MariaDB database pipelines, and real-time DDoS mitigation.

OneCraft Network Ecosystem

Technical Details

Role

Sole Engineer & System Administrator infrastructure design, backend development, security operations, and community management.

Timeline

April 17, 2025 – April 30, 2026 (12 months uninterrupted live production)

Architecture

Multi-tier cloud architecture with strict separation between a perimeter security/routing proxy layer and the core game logic backend. MariaDB relational database for player data and economy. Self-hosted Apache2 web platform and Mailcow mail server.

Peak Infrastructure

Phase 5 peak: Intel Core i9, 64GB RAM, 2TB NVMe dedicated server. Legacy VPS clusters maintained in parallel for zero-downtime migration.

Technology Stack

Linux (Debian/Ubuntu)JavaPaper/Fabric APIMariaDBReverse ProxyUFW/iptablesBashApache2MailcowTebex

Key Metrics

12 Months Live
Active Lifecycle
42 Players (100+ cap)
Peak Concurrent
342 Discord Members
Community
i9 / 64GB / 2TB NVMe
Bare Metal Spec

Key Challenges

  • 01Overcoming CGNAT without a public IP using playit.gg tunneling, then migrating to custom VPS edge proxies
  • 02Zero-downtime migration between 5 distinct infrastructure tiers across 12 months
  • 03Real-time mitigation of SYN floods, UDP amplification, and connection-flood DDoS attacks
  • 04Updating abandoned open-source Java plugins to modern Minecraft API versions
  • 05Operating 100% via Linux CLI without graphical panels or managed hosting
  • 06Balancing OpEx against revenue from Tebex cosmetic store non-pay-to-win model

Infrastructure Evolution

PhaseHardwareNetworkCost / moNotes
Phase 1Repaired E-Waste Office PCsCGNAT bypass via playit.gg tunnel~0 €/moLocal physical server room with custom ethernet and power distribution
Phase 2Local Cluster + 4GB Cloud VPSCustom reverse proxy, DNS (A/CNAME/MX), UFW firewalling~3 €/moAcquired onecraft.it domain. SSH key-based auth, root login disabled.
Phase 3Local Cluster + 16GB Backend VPSCross-node routing and load distribution~13 €/moHybrid scaling with managed cross-node traffic routing
Phase 48GB Proxy VPS + 32GB Backend VPSFull cloud multi-tier decoupling~20–40 €/moClean separation of perimeter security layer from game logic and database
Phase 5Intel Core i9, 64GB RAM, 2TB NVMe Dedicated ServerEnterprise bare-metal + legacy VPS clusters in parallelHundreds €/moZero-downtime migration from VPS to dedicated. Full production environment.

Technical Documentation

Full technical documentation, network architecture schematics, and incident reports are archived and available for technical interviews or academic review upon request.

This project was also presented as the official Capolavoro for UNICA the Italian secondary school capstone evaluation system.

Request Documentation →View Legacy Archive ↗